Wissenschaftliche Betriebsführung im Vorwerk mechanischer Webereien [Scientific Management in the Preparatory Departments of Mechanical Weaving Mills]

Sample pages
Page 1Page 2
Wissenschaftliche Betriebsführung im Vorwerk mechanischer Webereien [Scientific Management in the Preparatory Departments of Mechanical Weaving Mills], page 2
Page 2, at reduced quality. Open the document to read every page in full.

First installment of a 1927 article by Dr. Walther Mevius on applying scientific management (psychotechnics, time study, work planning) to the preparatory departments (Vorwerk) of a mechanical weaving mill. It outlines an analytical part (material standards, machine and worker performance norms, sizing control) and a synthetic part (marking systems, work orders, work distribution). It then describes a model 2000-loom plant with departments for winding and warping, sizing, drawing-in and reed work, and a planning office. Figures show a floor plan and Schlafhorst winding and warping machines.

Type
Article
Date
1927
Language
German
Pages
2
(A free account is all you need)
Search Inside This Document
Find any word on any of its 2 pages. Part of a word works too.

From Ralph Griswold's Digital Archive, delivered by the University of Arizona.
Have missing pages or a better copy of this document, or another document to share? Contributing documents »

© 2004 - 2026 Kris Bruland, Handweaving.net

Privacy Policy