Tappet and Dobby Looms: Their Mechanism and Management

Sample pages
Page 13Page 63Page 71Page 147Page 210
Tappet and Dobby Looms: Their Mechanism and Management, page 71
Page 71, at reduced quality. Open the document to read every page in full.

A 1912 technical manual on the construction, setting, timing and management of tappet and dobby power looms, written by a teacher of weaving at Huddersfield-area technical institutes. Nine chapters cover loom classification and driving, the going part and timing, tappet and dobby shedding, picking, shuttle-box and wefting-plan mechanisms, let-off, take-up and auxiliary motions such as stop-motions, temples and selvage formation. It is illustrated with many line drawings and includes faults and remedies drawn from the author's experience, plus a small number of weave and selvage drafts.

Type
Book
Date
1912
Language
English
Pages
234
Weaving drafts
on 8 pages: 63, 71, 147, 148, 149, 210, 217, 221
(A free account is all you need)
Search Inside This Document
Find any word on any of its 234 pages. Part of a word works too.

From Ralph Griswold's Digital Archive, delivered by the University of Arizona.
Have missing pages or a better copy of this document, or another document to share? Contributing documents »

© 2004 - 2026 Kris Bruland, Handweaving.net

Privacy Policy