Increasing Production and Decreasing Cost in Putting Up Piece Goods: How One Finishing Plant Has Reorganized for Quality Production and Increased Quantity

Sample pages
Page 4Page 6Page 7Page 9Page 10
Increasing Production and Decreasing Cost in Putting Up Piece Goods: How One Finishing Plant Has Reorganized for Quality Production and Increased Quantity, page 7
Page 7, at reduced quality. Open the document to read every page in full.

First part of a 1929 article describing how a cotton-cloth finishing plant reorganized its put-up (folding, wrapping, ticketing) department to raise output and cut cost. It covers the original congested layout and staffing, the planned reorganization into dispatcher, record clerk, inspector and supervisor roles, and motion-study work on bundling pieces of cloth. Time studies show a cut from 1.21 to 0.76 minutes per piece, along with a Gantt task-and-bonus wage plan and small devices such as a cord-cutting ring and a needle with the eye in the point. It ends with "To be continued".

Type
Article
Date
April 1929
Language
English
Pages
10
(A free account is all you need)
Search Inside This Document
Find any word on any of its 10 pages. Part of a word works too.

From Ralph Griswold's Digital Archive, delivered by the University of Arizona.
Have missing pages or a better copy of this document, or another document to share? Contributing documents »

© 2004 - 2026 Kris Bruland, Handweaving.net

Privacy Policy